The proposal calls for a total transmission capacity of 4 gigawatts by 2025 at a project cost of US$5.68 billion (HK$44.1 billion), the paper said, citing an interview with Alexey Kaplun, deputy general director of Russia’s RAO Energy System of East, the biggest power utility in the Russian Far East.
No comments:
Post a Comment